Re: FUEL ACCUMULATOR INSTALLATION
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: FUEL ACCUMULATOR INSTALLATION



Your argument is moot. Most shops I know of at least for the first 
hour do not break it down i.e. you pay for the first full hour even if 
the job is done in 30 min. Some will be fair and if the job takes 90 
min will charge for 1 1/2 hours not 2. Since they are working on a 20 
year old car and have no idea what they are in for will not take it at 
a flat rate, this was meant for an experienced shop working on fairly 
new cars. Expect at least 1 hour, 2 would be fair.
David Teitelbaum
vin 10757


--- In dmcnews@xxxx, DHughes030@xxxx wrote:
> I would not agree to do it for 1/2 hr. sight unseen, if I were the 
tech. I/ve 
> studied its location, even had the fuel return line attached to it 
rupture 
> and it took all of 30 min. to swap it out in that confined space. 
(it was a 
> side of the road repair) Be a little more generous than .5 HR or do 
it 
> yourself, your tech is trying to feed a family (or buy a Delorean) 
too.
> Don VIN 6860






Home Back to the Home of PROJECT VIXEN 


Copyright ProjectVixen.com. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
DMCForum Mailing List Archive  DMCNews Mailing List Archive  DMC-UK Mailing List Archive

This site contains affiliate links for which we may be compensated